Mortagne/Trith St. Léger - River Scheldt

At the Mortagne-St.Léger section of the River Scheldt its riverbanks have been refurbished as part of a contract awarded by the French River Autority (VNF).  This contract has been carried out between August 2006 and june 2008.

Approximately 15km of riverbanks have been refurbished using 46.600m² of filterfabric and 75.000 tonnes of stones.  About 88.000m³ of soil have been shifted.

 
 
 
 .

In global 15,2km of shore had to reprofiled.  Also 46.600m² of geotextile and 75.000 tons of rocks were placed.  As finishing touch, 125.000m² was sowed.
There was a complete soil transport of 88.000m³.

 
 
 